Petronas Carigali Sbn Bhd(PCSB)
SOGT (Sabah Oil & Gas Terminal) Project
![]()
![]()
설계단계
Feasibility
CD = Concept Design
SD = Schematic Design
DD = Design Development
CD = Construction Document
Basic Design :기본(기초)설계
Detail Design :상세설계
Layout :배치도
시공단계
purchasing...구매
inspection....검사
Transportation...운송
Expediting.....이행관리
Field Material Control....현장 자재관리
Field Engineering ....시공 현장 지원
FINANCING ....재원 조달
PUBLIC LOAN...공공 차관
COMMERCIAL LOAN ....상업차관
BUYER'S CREDIT...구매자 신용
SUPPER'S CREDIT...공급자 신용
Cost Innovation....원가 혁신
SYNDICATE......차관단
TERMS AND CONDITION ....차관 조건
INTEREST...이자
REPAYMENT..원금 상환
GRACE PERIOD...거치 기간
COMMITMENT FEE ...약정 수수료
BIDDING .....입찰
PRE-QUALIFICATION..도급 지명원
TENDER DOCUMENT OR ITB (= INVITATION TO BID )....입찰 초청서 작성
LI = LETTER OF INTENT......발주 의향서
NTP = NOTICE TO PROCEED ...착공지시서
P&ID = PIPING & INSTRUMENT DIAGRAM
PFD = PROCESS FLOW DIAGRAM
PROCUREMENT...구매
MTO = MATERIAL TAKE OFF
DETAIL ENGINEERING ....상세 설계
FIELD ENGINEERONG......현장 설계
AREA CLASSIFICATION DRAWING......방폭 구역도
TBE = TECHNICAL BID EVAL!UATION....설계부서의 기술적 평가
CBE = COMMERCIAL BID EVAL!UATION...구매부서의 상업적 평가
TCM = TECHNICAL CLARIFICATION MEETING..견적서의 내용을 명확히 하기 위한 견적업체와의 회의
VENDOR LIST ...납품자 리스트
INQUIRY OR RFQ........견적 요청서
CONSTRUCTION ---건설
PRECOMMISSIONING...기기나 기계가 목적한 대로 작동이 되도록 만들어 놓는 작업
COMMISSIONING .....운전 교본의 지침에 따라 원료 및 부자재를 정상 운전상태와
똑같이 투입하여 처음으로 공장의 설비를 실제로 가동하는 단계
INITIAL OPERARION OR START-UP....생산 시설을 처음 운전하는 단계 시운전.
부하를 100% 올려서 설게기준에 부합되는 안정상태까지 운전되는 것을 칭함.
PERFORMANCE GUARANTEE TEST......성능 보장 시험
ERECTION COMPLETION.....설치 공사 완료
Planning & Schedule Control......공정관리
품질 : Quality
공기 : Schedule
원가 : Cost
안전 : Safety
공정 : Process
협업 : Joint Venture or 컨소시움
공용 : Utility
안전성 운전성...HAZOP
제품 : Product
특허 : Licensed
일반공정 : Open Art Process
표준 : standards
표준화 : Standardization
ISO 9001......[ QMS-Requirement ]
ISO 14001....[환경경영시스템]
OHSAS 18001...[보건/안전시스템 ]
COORDINATION...업무협조
RESOURCE....자원
CLIENT...발주자
CONTRACTION...계약자
APPROVAL....승인
Profit Creator .....이익창출자
Negotiation Skill.....협상 능력
Communication Skill...언어구사 능력
MC = Mechanical Completion Certificate.....기계적 준공 확인서
Mechanical Data Sheet.....기계 사양서
Think Safety! Act Safetly!
BSV = Behavior Safety Visit
PSM = Process Safety Management
전기:
HT : High Tension (Rating above 11KV )...High Voltage Transmission
LT : Low Tension (Rating uptp 11 KV),(Below 11 kv)....Low Voltage Transmission
LE: 일반판넬 (Lightening Emergency)
LEM:비상판넬(Lightening Emergency Main)
SS:전기실의 수배전반
IPCS : 통신기술 및 전력제어 시스템 [ Integrated Protection & Control System ]
LP:전등판넬
LCP:조명 제어 판넬
PM:동력판넬(전열부하)
PEM:비상동력 판넬
KM = knowledge Management
QTAP = Quality Tirnover Auto Package
FMCS = Field Matirial Control System
NCR = Nonconformance Report
TER = Trouble & Error Report
COPQ = Cost of Poor Quality
QRS = Quility Rating System
IM&TE = Inspection Measuring and Test Equipment
Q-Line = Quality Live innovation New Engibeering
PSI = Plant Satisfaction Index
GOSP = Gas & Oil Separation Plant
NGL = Natural Gas Liquid
FSO = Floating Storage and Offloading System
BS = British Standards
NFPA = National Fire Protection Association
LNG = Liquefied Natural Gas
Warehouse ...창고
mgt = Management
PCN = Process Control Narrative
PSM = Process Safeguard Memorandum
MSD = Material Selection Diagram
DMAIC = Define ->Measure->Analyze->Improve->Control
Risk관리에 초점
DMADOV = Define->Measure->Analyze->Design->Optimize->Verify
공법의 완벽 수행에 초점
UCS = User Controlled Scheduling & Microsoft Project Professional 2010
|
|
첫댓글 알고있으면 편리할수 있는 용어가 많군요^^ 잘 계시지요?