안전.보건.환경 규정 Quy định quản lý công trình (công trường)
| Document No. : HSM100_001 Revision No. : Rev.01 Issue Date : April. 20. 2020 |
EHS Visual Management Guide on Site
(눈으로보는 EHS현장관리 )
Date | Content | In charge | PM팀장 | CMO | CEO(사장) |
April.30.2020 | 제정 (Ban hành) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Background & Purpose of EHS Visual Management도입배경 및 목적)
a. Apply correct HAEOREUM E&C’s Logo and vision in signage for cooperate identification EHS on Site
b. Standarze EHS placard,Sign,Poster on the Construction Site (해오름 건설현장의 현수막,사인,포스터의 표준화)
c. Enhance EHS with visual management of the Construction Site
d. Implement Haeoreum E&C standard of EHS sign for Vietnamese employees
2. Key Elements of EHS Visual Management
a. HAEOREUM E&C Logo and Vision in EHS signage(EHS 사인물 내의 회사로그와 비젼)
b. EHS signage
-. Placard(현수막)
-. EHS sign(EHS 표지판)
-. Safety Gate
-. Safety Tag
-. Contractor EHS performance management(협력사 EHS성과관리)
3. HAEOREUM E&C Logo and Vision in EHS signage
(Apply correct HAEOREUM E&C’s Logo and vision in signage for cooperate identification EHS)
1. Lost time accident score or statistics board guide(재해현황판)
a. Designated area : Site entrance or any outdoor place which is indentified easily for all employees.(현장 입구나 전직원들이 쉽게 볼수 있는 야외지역)
b. Each site can add any other EHS related record such as NO. OF DAYS LOST, NEARMISS REPORTED & ETC(공간에 다른 EHS 기록들을 넣어도 된다)
1. EHS information or bullentin board guide(EHS정보 알림판)
a. Designated area : Any office or corridor wall which is identified easily for all employees.
b. Each site post any safety alert but must includes Emergency information, Accident case sharing.
c. There is no standard spec of size, color of this board.
1. Sub Contractor EHS performance dashboard(협력업체 EHS성과 판)
a. Designated area : Any outdoor place near by TBM area.
b. How to Use :
-. Measure the sub-contractor performance in EHS
-. Is based on : Safety inspection results, Safety meeting attending,safety reports.
-. Every Sub-contractor is inspected every day.
-. Substandard acts and conditions area recorded in “EHS INTERFACER MULTILAYER DATA BASE”
-.Substandard acts and conditions communication to sub-contractor in daily safety meetings.
TRAFFIC LIGHT | TASKS |
Green(Between 90 and 100) | Daily inspections |
Yellow(Between 80 and 89) | Daily inspections , Written Notification(by Letter) Contractor specific action plan audits Two months in Yellow go to Red color Action Plan non compliance action go to Red color. Serious incident go directly to red color |
Res( Below 79) | Contractor Site Removal Contractor removal from approved prequalified Contractors List |
TRAFFIC LIGHT DASHBOARD (Target > 90) |
No. | Company Name | Performance(Color) |
1 | D construction | 99.5 |
2 | H Steel | 92.5 |
3 | CC Panel | 88.1 |
4 | E Electric Company | 90.5 |
5 | H HVAC Company | 75 |
6 | DOW company | 95 |