Replacement of the Ruhr Canal “Yellow Overbridge” | Project | Eiffage Infra-Bau
The existing structure is a dual-area, steel framework structure with a lower track. There is no passage impact and the individual support widths are 75 m (450 to canal area) and 34 m (150 to road area).The new abutments each weigh approx. 1,000 tons and w
bau.eiffage-infra.de