Wall |
7 | Built-up studs-face nail | 10d (3″ × 0.128″) | 24″ o.c. |
8 | Abutting studs at intersecting wall corners, face nail | 16d (31/2″ × 0.135″) | 12″ o.c. |
9 | Built-up header, two pieces with 1/2″ spacer | 16d (31/2″ × 0.135″) | 16″ o.c. along each edge |
10 | Continued header, two pieces | 16d (31/2″ × 0.135″) | 16″ o.c. along each edge |
11 | Continuous header to stud, toe nail | 4-8d (21/2″ × 0.113″) | — |
12 | Double studs, face nail | 10d (3″ × 0.128″) | 24″ o.c. |
13 | Double top plates, face nail | 10d (3″ × 0.128″) | 24″ o.c. |
14 | Double top plates, minimum 24-inch offset of end joints, face nail in lapped area | 8-16d (31/2″ × 0.135″) | — |
15 | Sole plate to joist or blocking, face nail | 16d (31/2″ × 0.135″) | 16″ o.c. |
16 | Sole plate to joist or blocking at braced wall panels | 3-16d (31/2″ × 0.135″) | 16″ o.c. |
17 | Stud to sole plate, toe nail | 3-8d (21/2″ × 0.113″) or 2-16d (31/2″ × 0.135″) | — — |
18 | Top or sole plate to stud, end nail | 2-16d (31/2″ × 0.135″) | — |
19 | Top plates, laps at corners and intersections, face nail | 2-10d (3″ × 0.128″) | — |
20 | 1″ brace to each stud and plate, face nail | 2-8d (21/2″ × 0.113″) 2 staples 1 3/4″ × | — — |
21 | 1″ × 6″ sheathing to each bearing, face nail | 2-8d (21/2″ × 0.113″) 2 staples 1 3/4″ | — — |
22 | 1″ × 8″ sheathing to each bearing, face nail | 2-8d (21/2″ × 0.113″) 3 staples 1 3/ 4 | — — |
23 | Wider than 1″ × 8″ sheathing to each bearing, face nail | 3-8d (21/2″ × 0.113″) 4 staples 13/4″ | — — |
Floor |
24 | Joist to sill or girder, toe nail | 3-8d (21/2″ × 0.113″) | — |
25 | Rim joist to top plate, toe nail (roof applications also) | 8d (21/2″ × 0.113″) | 6″ o.c. |
26 | Rim joist or blocking to sill plate, toe nail | 8d (21/2″ × 0.113″) | 6″ o.c. |
27 | 1″ × 6″ subfloor or less to each joist, face nail | 2-8d (21/2″ × 0.113″) 2 staples 13/4″ | — — |
28 | 2″ subfloor to joist or girder, blind and face nail | 2-16d (31/2″ × 0.135″) | — |
29 | 2″ planks (plank &beam - floor &roof) | 2-16d (31/2″ × 0.135″) | at each bearing |
30 | Built-up girders and beams, 2-inch lumber layers | 10d (3″ × 0.128″) | Nail each layer as follows: 32″ o.c. at top and bottom and staggered. Two nails at ends and at each splice. |
31 | Ledger strip supporting joists or rafters | 3-16d (31/2″ × 0.135″) | At each joist or rafter |