SHIP-TO-SHIP TRANSFER CHECK-LIST I - PRE-FIXTURE INFORMATION (FOR EACH SHIP) (BETWEEN SHIP OPERATOR/CHARTERER AND ORGANISER)
Ships Name: MT. |
||||
Ship Operator: |
Ship Charterer: |
STS Organiser: |
||
Preferred Contact No. (e.g. INMARSAT) |
Ship Operator’s Confirmation |
Remarks |
||
1. What is the LOA? What is parallel body length at loaded and ballast draughts? |
|
|
||
2. Will the transfer be conducted underway and, if so, can the ship maintain about five knots fort minimum of two hours? |
|
|
||
3. Is the ship’s manifold arrangement in accordance with OCIMF Recommendations for Oil Tanker Manifolds and Associated Equipment? |
|
|
||
4. Is the ship’s lifting equipment in accordance with OCIMF Recommendations for Oil Tanker Manifolds and Associated Equipment? |
|
|
||
5. What is the maximum and minimum expected height of the cargo manifold from the waterline during the transfer? |
|
|
||
6. Sufficient manpower will be provided for all stages of the operation? |
|
|
||
7. Are enclosed fairleads and mooring bills in accordance with OCIMF Mooring Equipment Guidelines and are they of a sufficient number? |
|
|
||
8. Can the ship supplying the moorings provide all lines on winch drums? |
|
|
||
9. If moorings are wires or high modulus synthetic fibre ropes, are they filled with synthetic tails at least eleven metres in length? |
|
|
||
10. Full-sized mooring bitts of sufficient strength are suitably located near all enclosed fairleads to receive mooring ropes eyes? |
|
|
||
11. Both sides of the ship are clear of any overhanging projections including bridge wings? |
|
|
||
12. The transfer area has been agreed? |
|
|
||
FOR DISCHARGING SHIP / RECEIVING SHIP (Delete as appropriate) |
|||
Name: |
|||
Rank: |
|||
Signature: Date: |
|||
SHIP To SHIP TRANSFER CHECK-LIST 2 - BEFORE OPERATIONS COMMENCE
Discharging Ship’s Name: |
|||
Receiving Ship’s Name: |
|||
Date of Transfer: |
|||
|
Discharging Checked |
Receiving Ship Checked |
Remarks |
1. Two ships have been advised by ship owners that Chick list 1 has been completed satisfactorily? |
|
|
|
2. Personnel comply with rest requirements of ILO 180, STCW and national regulations as appropriate? |
|
|
|
3. Radio communications are established? |
|
|
|
4. Language of operations has been agreed? |
|
|
|
5. The rendezvous position off the transfer area is agreed? |
|
|
|
6. Berthing and mooring procedures are agreed, including fender positions and number / type of ropes to be provided by each ship? |
|
|
|
8. The ships are upright and at a suitable trim without any overhanging projections? |
|
|
|
9. Engines, steering gear and navigational equipment have been tested and found in good order? |
|
|
|
10. Ship's boilers and tubes have been cleared of soot and it is understood that during STS operations, tubes must not be blown? |
|
|
|
11. Engineers have been briefed on engine speed (and speed adjustment) requirements? |
|
|
|
12. Weather forecasts have been obtained for the transfer area? |
|
|
|
13. Hose lifting equipment is suitable and ready for use? |
|
|
|
14. Cargo transfer hoses are properly tested and certified and in apparent good condition? |
|
|
|
15. Fenders and associated equipment are visually in apparent good order? |
|
|
|
16. The crew have been briefed on the Mooring procedure? |
|
|
|
17. The contingency plan is agreed? |
|
|
|
18. Local authorities have been advised about the operation? |
|
|
|
20. The other ship has been advised that Check- List 2 is satisfactorily completed? |
|
|
|
FOR DISCHARGING SHlP / RECEIVING SHlP (Delete as appropriate) |
|||
Name: |
|||
Rank: CHIEF OFFICER |
|||
Signature: Date: |
|||
SHIP To SHIP TRANSFER CHECK-LIST 3 - BEFORE RUN-IN AND MOORING
Discharging Ship’s Name: |
|||
Receiving Ship’s Name: |
|||
Date of Transfer: |
|||
|
Discharging Checked |
Receiving Ship Checked |
Remarks |
1. Check-List 2 has been satisfactorily completed?
|
|
|
|
2. Primary fenders are floating in their proper place? Fender pennants are in order? |
|
|
|
3. Secondary fenders are in place, if required?
|
|
|
|
4. Over side protrusions on side of berthing are retracted? |
|
|
|
5. A proficient helmsman is at the wheel?
|
|
|
|
6. Cargo manifold connections are ready and marked? |
|
|
|
7. Course and speed information has been exchanged and is understood?
|
|
|
|
8. Ship's speed adjustment is controlled by changes to revolutions and/or propeller pitch?
|
|
|
|
9. Navigational signals are displayed?
|
|
|
|
10. Adequate lighting is available?
|
|
|
|
11. Power is on winches and windlass and they are In good order?
|
|
|
|
12. Rope messengers, rope stoppers and heaving lines are ready for use? |
|
|
|
13. All mooring lines are ready? |
|
|
|
14. All mooring personnel are in position?
|
|
|
|
15. Communications are established with mooring personnel? |
|
|
|
16. The anchor on opposite side to transfer is ready for dropping? |
|
|
|
17. The other ship has been advised that Check-List 3 is satisfactorily completed? |
|
|
|
FOR DISCHARGING SHlP / RECEIVING SHlP (Delete as appropriate) |
|||
Name: |
|||
Rank: CHIEF OFFICER |
|||
Signature: Date: |
|||
SHIP To SHIP TRANSFER CHECK-LIST 4 - BEFORE CARGO TRANSFER
Discharging Ship’s Name: |
|||
Receiving Ship’s Name: |
|||
Date of Transfer: |
|||
|
Discharging Checked |
Receiving Ship Checked |
Remarks |
1. The ISGOTT ship/shore safety check-list has been satisfactorily completed. |
|
|
|
2. Procedures for transfer of personnel have been agreed |
|
|
|
3. The gangway (if used) is in good position and well secured? |
|
|
|
4. An inter-ship communication system is agreed?
|
|
|
|
5. Emergency signals and shutdown procedures are agreed? |
|
|
|
6. An engine room watch will be maintained Throughout transfer and the main engine ready for immediate use? |
|
|
|
7. Fire axes or suitable cutting equipment is in position at fore and aft mooring stations? |
|
|
|
8. A bridge watch and/or an anchor watch are established? |
|
|
|
9. Officers in charge of the cargo transfer on both ships are identified and posted. |
|
|
|
10. A deck watch is established to pay particular attention to moorings, fenders, hoses, manifold observation and cargo pump controls? |
|
|
|
11. The initial cargo transfer rate is agreed with other ship? |
|
|
|
12. The maximum cargo transfer rates agreed with the other ship? |
|
|
|
13. The topping-off rate is agreed with other ship? |
|
|
|
14. Cargo hoses are well supported? |
|
|
|
15. Tools required for rapid disconnection are Located at the cargo manifold?
|
|
|
|
16. Details of the previous cargo of the receiving Ship have been given to the discharging ship? |
|
|
|
17. The other ship has been advised that Check-List 4 is satisfactorily completed?
|
|
|
|
FOR DISCHARGING SHlP / RECEIVING SHlP (Delete as appropriate) |
|||
Name: |
|||
Rank: CHIEF OFFICER |
|||
Signature: Date: |
|||
SHIP To SHIP TRANSFER CHECK-LIST 5 - BEFORE UNMOORING
Discharging Ship’s Name: |
|||
Receiving Ship’s Name: |
|||
Date of Transfer: |
|||
|
Discharging Checked |
Receiving Ship Checked |
Remarks |
1. Cargo hoses are properly drained prior to hose disconnection? |
|
|
|
2. Cargo hoses or manifolds are blanked?
|
|
|
|
3. The transfer side of the ship is clear of obstructions (including hose lifting equipment)?
|
|
|
|
4. Secondary fenders are correctly positioned and secured for departure?
|
|
|
|
5. The method of unberthing and of letting go moorings has been agreed with the other ship? |
|
|
|
6. Fenders, including fender pennants, are in good order? |
|
|
|
7. Power is on winches and windlass?
|
|
|
|
8. There are rope messengers and rope stoppers at all mooring stations? |
|
|
|
9. The crew are standing by at their mooring stations?
|
|
|
|
10. Communications are established with mooring personnel and with the other ship?
|
|
|
|
11. Shipping traffic in the area has been checked? |
|
|
|
12. Main engine(s) and steering gear have been tested and are in a state of readiness for departure?
|
|
|
|
13. Mooring personnel have been instructed to let go only as requested by the manoeuvring ship?
|
|
|
|
14. Navigational warnings have been cancelled (when clear of other ship)? |
|
|
|
15. The other ship has been advised that Check-List 5 is satisfactorily completed? |
|
|
|
FOR DISCHARGING SHlP / RECEIVING SHlP (Delete as appropriate) |
Name: |
Rank: CHIEF OFFICER |
Signature: Date: |