12/29/A/4=NO.2 AUX BFP 냉각수 IN,OUT, SAMPLING 냉각수 MIN' OPEN 중
12/21/A/2=NO.2 AUX DRUM SAMPLING COOLER C.W VENT LINE 파손 관련☞LINE 교체
12/18/D/3=NO.2 AUX D/A SRM CONT' V/V 동작 상태 불량, 자재 입고 후 점검 예정(CONT' 전단 20% OPEN상태)
12/14/D/2=NO.2 AUX D/A STM CONT'V/V 점검 중
12/13/A/3=NO.2 AUX D/A STM CONT' V/V 점검후 개도 TEST 실시(OUTPUT 65부터 천천히 OPEN됨, 명일 재작업예정)
12/13/D/2=NO.2 AUX D/A STM CONT' V/V 점검 중
12/12/A/3=NO.2 AUX D/A STM CONT' V/V(PCV-140) 동작 불가-TM-
12/10/N/3=NO.2 AUX D/A STM CONT' V/V(PCV-140) 동결, CONT' 전단 V/V FULL CLOSE
12/6/A/1=NO.2 AUX D/A SIGHT GLASS 상, 하부 V/V CLOSE, DRAIN OPEN(DRUM은 조작되어 있는 상태)
11/6/N/4=NO.2 AUX D/A STM CONT' V/V 하부 보온재안 STM LEAK-TM-
9/28/A/2=NO.2 AUX D/A STM CONT' V/V(PCV-140) POSITIONER소제 및 CALIBRATION 완료(CONT' 전단 OPEN, BY-PASS CLOSE)
5/4/D/3=NO.2 AUX D/A STM CONT' V/V BODY측 STM LEAK-TM-
5/3/A/4=NO.2 AUX D/A CONT' 전,후 V/V BONNET GASKET 교체(V/V 정상화)
5/3/D/3=NO.2 AUX D/A STM CONT' 전후단 V/V BONNET GASKET 교체 중(D/A STM CONT' V/V 하부 DRAIN OPEN, D/A STM LINE(1F)DRAIN TRAP BY-PASS OPEN, MAIN STM 최종단 V/V CLOSE 및 전단 DRAIN OPEN
5/2/N/1=NO.2 AUX COP#A,B DISC' V/V CLOSE, BRK OFF
4/2/A/2=NO.2 AUX COP#A DISC' PR' GAUGE 불량 -TM-
3/29/A/1=NO.2 AUX BFP#A 당분간 기동 요망
3/29/D/3=NO.2 AUX DRUM SAMPLING RACK CHAMBER 전단 NIPPLE 연결 LINE 이탈부 체결 완료
*NO.2 AUX BFP#A 점검실시☞PUMP SUC' BRG 미세 이음(계전팀 추정)-당분간 돌리지 말것, BRK OFF
*NO.2 AUX DRUM SAMPLING COOLER INLET NIPPLE WATER LEAK
3/28/A/4=NO.2 AUX BFP#A 기동TEST실시-당분간#A 기동요망(기동시 이창활팀장에게 연락요망)
*BFP#A,B SUC & DISC' PRESS GAUGE파손-TM-
3/28/D/3=NO.2 AUX DRUM SAMPLING RACK CHAMBER 전단 NIPPLE부 LINE이탈-TM-(cooler outet v/v close)
*NO.2 AUX BFP#A MOTOR SOLO TEST실시(전기계)
*NO.2 AUX BFP#A ALIGNMENT 및 기동 TEST
3/22/D/1=NO.2 AUX BFP#A MOTOR FAN측 분해 중(BRK OFF)
3/21/D/1=NO.2 AUX BFP#A 기동 TEST(MOTOR HORIZONTAL측 진동 심함, 비상시 기동 요망)
3/20/D/4=NO.2 AUX DRUM SAMPLING COOLER 분해 소제(C.W IN, OUT CLOSE, C.W LINE 막힘☞점검 및 관통 중, sampling v/v close, drain open☞작업 완료, V/V정상화
3/19/A/1=NO.2 AUX BFP#A 안착, 조립 및 ALIGNMENT 완료
3/19/D/4=NO.2 AUX BFP#A 안착, 조립 및 ALIGNMENT 중
3/8/N/3=NO.2 AUX DRUM VENT CLOSE
3/7/A/1=NO.2 AUX TUBE 파공부 점검 및 보수 완료(DRUM VENT OPEN상태, STAND BY)
3/7/D/4=NO.2 AUX 상부 DRUM☞BLOWDOWN TANK행 STM LINE 교체 취소
*TUBE 파공부 점검 및 보수 중(FURNACE MAN-HOLE OPEN, BFP#B DISC' CLOSE, ECO 전후단 DRAIN OPEN)
3/7/N/3=NO.2 AUX DRUM VENT OPEN, L.P HDR행 STM V/V CLOSE(전단 DRAIN OPEN), F.W 급수 CONT' 전단 MANU' V/V CLOSE, F.D FAN ACB개방, BFP#B BRK OFF, DOWNCOMMER OPEN
2/26/A/2=DRUM VENT CLOSE
2/26/D/1=NO.2 AUX 상부 DRUM TUBE 파공부 보수 완료, F.D FAN VCB투입, BFP#B BRK ON, V/V 정상화, DRUM VENT OPEN 상태
2/23/D/4=NO.2 AUX 상하부 DRUM TUBE 파공부 보수 중(FD FAN ACB개방, BFP#B BRK OFF 및 DISC' V/V CLOSE, ECO 전후단 DRAIN OPEN, 배관망 행 STM MAN' V/V CLOSE(drain 2곳 open)
2/22/A/1=NO.2 AUX TUBE 파공부 확인(WALL TUBE 3EA, BANK TUBE 8EA)
2/20/A/4=NO.2 AUX DOWN COMMER & DRUM VENT OPEN, FEED WATER CONT' 전단 MANU' V/V CLOSE
2/13/A/2=NO.2 AUX' D/A 급수 CONT' V/V CALIBRATION실시
2/9/D/3=NO.2 AUX ECO SAFETY V/V SETTING치 조절
*F.D FAN DAMPER 점검 중
*D/A 급수 CLOSE & DRUM VENT OPEN상태
2/1/A/2=NO.2 AUX ECO SAFETY V/V PASSING 심함-TM-
1/29/D/4=NO.2 AUX BFP#A PUMP 분해(SUC'측 CASING 하부 동파 관련)
*NO.2 AUX BFP#A MOTOR BEARING 교체 중(BRK OFF)
1/28/A/1=BFP#A SUC' CASING 하부 파손(C.W IN FLANGE OPEN)
1/24/A/3=DRUM WALL TUBE 49,50,51,72 파공부 작업 완료
*F/W CONT' V/V 및 D/A 급수 CONT' 전단 MANU' V/V 동결로 고착상태
1/23/D/2=NO.2 AUX에서 배관망 행 MANU' V/V CLOSE 및 DRAIN OPEN(2군데), TUBE 파공부 점검 중
1/22/A/3=NO.2 AUX TUBE 파공부 명일 계속 확인 예정(DOWN COMMER 2EA OPEN, LOW DRUM MAN-HOLE OPEN, DRUM VENT OPEN)
1/22/D/1=NO.2 AUX TUBE 파공부 점검 중(F.D FAN ACB 개방, BFP#A,B DISC'V/V CLOSE,MAN-HOLE OPEN)
1/16/D/3=NO.2 AUX BFP#A MOTOR 이음 관련 DE/NDE GREASE 주입(TEST실시☞이음 완화)
1/4/D/3=NO.2 AUX BFP#A MOTOR측 이음 발생, 08:30 BFP#B로 전환☞전기계 의뢰